Violation Detail
Standard Cited: 19100036 G02 Design and construction requirements for exit routes.
Inspection Nr: 1408490.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $8,335.00
Current Penalty: $6,846.00
Issuance Date: 12/11/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0213400
Contest Date:
Final Order: 01/06/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/06/2020 | $6,846.00 | Serious | ||
Penalty | Z: Issued | 12/11/2019 | $8,335.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(g)(2): Exit access(es) were not at least 28 inches (71.1 cm) wide at all points. a) Recycle Inc. East dba Mauser Packaging Solutions/South Plainfield, NJ- Drum grinder area: Employer did not ensure that exit access was kept free and unobstructed. Drums were placed within the exit route limiting it's width to 18 inches, delaying employees exit in case of an emergency. Condition noted on or about September 12, 2019.