Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1408035.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $13,260.00
Current Penalty: $7,956.00
Issuance Date: 11/08/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 12/03/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/03/2019 | $7,956.00 | Serious | ||
| Penalty | Z: Issued | 11/08/2019 | $13,260.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): On or about June 11, 2019, incomplete guarding was provided for the bun pan un-stacking machinery. The pan un-stacker cell/unit which contained interlock guarding had areas in which employees could reach hazardous machine functions such as, but not limited to; the magnetic pan lifter.
Translate