Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1407779.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,472.00
Current Penalty: $5,209.60
Issuance Date: 12/06/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/09/2020
Gravity: 5
Report ID: 0626600
Contest Date: 12/12/2019
Final Order: 02/05/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/05/2020 | $5,209.60 | 03/09/2020 | Serious | |
Penalty | C: Contested | 12/12/2019 | $9,472.00 | 12/26/2019 | Serious | |
Penalty | Z: Issued | 12/06/2019 | $9,472.00 | 12/26/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedure did not clearly and specifically specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: On or about June 11 2019, in the press area of the facility where employees were exposed to steam burns and struck-by hazards when performing service and/or maintenance tasks on the press machinery without having developed specific procedures for controlling hazardous energy.