Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1406638.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,282.00
Current Penalty: $5,570.00
Issuance Date: 12/06/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/01/2020
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 01/02/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/02/2020 | $5,570.00 | 06/01/2020 | Serious | |
Penalty | Z: Issued | 12/06/2019 | $9,282.00 | 01/27/2020 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams were not accurate and did not represent equipment that was existing and was part of the process. a) On or about 6/10/2019, at the Texmark Chemical facility located at 900 Clinton Dr. Galena Park, Texas, the employer did not ensure that the set pressure of PSV-1313 on the piping and instrument diagram (PI-150-002) represented the set pressure of the pressure safety PSV-1313 installed in the field. The PSV nameplate indicates a set pressure of 280 psig, the PSV tag indicates a set pressure of 700 psig and the piping and instrument diagram indicates a set pressure of 520 psig.