Violation Detail
Standard Cited: 19260403 B01 VII General requirements.
Inspection Nr: 1404631.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $13,127.00
Current Penalty: $10,000.00
Issuance Date: 11/20/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0728500
Contest Date: 12/13/2019
Final Order: 08/16/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/16/2021 | $10,000.00 | Serious | ||
Penalty | C: Contested | 12/17/2019 | $13,127.00 | Serious | ||
Penalty | Z: Issued | 11/20/2019 | $13,127.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.403(b)(1)(vii): Safety of equipment were not determined on the basis of the following considerations: Other factors which contribute to the practical safeguarding of employees using or likely to come in contact with the equipment: The employer is failing to protect employees from electrical shock and burns. This was most recently documented on or about 05/29/2019, at a jobsite located at the 2600 block of NE 46th St, KC MO. The employer did not examine the cord for the electric pump being used to pump water out of the trench. The cord is missing the ground pin which caused the path to ground to not be permanent and continuous.