Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1402692.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $9,661.00
Current Penalty: $6,762.00
Issuance Date: 07/17/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 08/09/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection | 
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/09/2019 | $6,762.00 | Serious | ||
| Penalty | Z: Issued | 07/17/2019 | $9,661.00 | Serious | 
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about 05/18/2019 - Ross Drier area, VOITH Threader machine, procedures were not developed or utilized for employees re-threading the sheet reels.
Translate