Violation Detail
Standard Cited: 19260025 A Housekeeping.
Inspection Nr: 1402320.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,273.00
Current Penalty: $1,136.50
Issuance Date: 07/18/2019
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 08/08/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/08/2019 | $1,136.50 | Serious | ||
Penalty | Z: Issued | 07/18/2019 | $2,273.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures: (a) 1121 N. Jefferson St Jackson MS - On or about May 20, 2019 the employer allowed lumber with protruding nails and other construction materials to accumulate at the job-site, exposing employees to struck-by hazards .