Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1402298.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $85,248.00
Current Penalty: $9,472.00
Issuance Date: 06/13/2019
Nr Instances: 1
Nr Exposed: 121
Abatement Date: 07/31/2019
Gravity: 5
Report ID: 0936100
Contest Date:
Final Order: 07/05/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/05/2019 | $9,472.00 | 07/31/2019 | Serious | |
Penalty | Z: Issued | 06/13/2019 | $85,248.00 | 07/31/2019 | Repeat |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): The employer did not ensure that employees were able to open an exit route door from the inside at all times without keys, tools, or special knowledge. 1st Floor Workroom: The emergency exit discharge door was kept locked, which led to Larkin Street. Employees were exposed to entrapment hazards.