Violation Detail
Standard Cited: 19100269 N03 Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1400508.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,282.00
Current Penalty: $0.00
Issuance Date: 08/01/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/07/2019
Gravity: 10
Report ID: 0111100
Contest Date:
Final Order: 08/22/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/22/2019 | $0.00 | 08/07/2019 | Serious | |
Penalty | Z: Issued | 08/01/2019 | $9,282.00 | 08/07/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(n)(3): Temporary protective grounds were not placed and arranged in such a manner that would prevent each employee from being exposed to hazardous differences in electric potential as required: Section 166, Pole 259 - On 13 May 2019, an employee was seriously injured while working on an 115KV distribution line. Temporary protective grounds were not installed.