Violation Detail
Standard Cited: 19260452 C02 Additional requirements applicable to specific types of scaffolds.
Inspection Nr: 1396882.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $3,978.00
Current Penalty: $3,978.00
Issuance Date: 10/04/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/24/2019
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order: 11/01/2019
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 10/04/2019 | $3,978.00 | 10/24/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: a) 1404 East Palmer St., Philadelphia, PA 19125 - The employer did not ensure that each tubular welded frame of a scaffold, on which employees performed brick masonry at heights up to 24 feet, was cross-braced, thus exposing employees to fall from height and struck-by hazards. This condition was observed on or about April 9, 2019.