Violation Detail
Standard Cited: 19100176 A Handling materials - general.
Inspection Nr: 1394914.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $13,260.00
Issuance Date: 10/10/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/13/2023
Gravity: 10
Report ID: 0418300
Contest Date: 11/05/2019
Final Order: 12/12/2022
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 12/12/2022 | $13,260.00 | 02/13/2023 | Other | |
| Penalty | C: Contested | 11/07/2019 | $13,260.00 | 11/06/2019 | Serious | |
| Penalty | Z: Issued | 10/10/2019 | $13,260.00 | 11/06/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.176(a): Where mechanical handling equipment was used, sufficient safe clearances were not allowed for aisles, at loading docks, through doorways or wherever turns or passage must be made: (a) On or about 04/19/2019 - Shipping bay, southwest side, the employer did not develop procedures to ensure adequate clearance between the structural steel columns is maintained to prevent slings from snagging during the loading process.