Violation Detail
Standard Cited: 19100119 D03 I Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 1393132.015
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $8,051.00
Current Penalty: $0.00
Issuance Date: 10/10/2019
Nr Instances: 95
Nr Exposed: 95
Abatement Date: 12/03/2019
Gravity: 5
Report ID: 0111400
Contest Date: 11/05/2019
Final Order: 04/10/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/10/2020 | $0.00 | 12/03/2019 | Serious | |
Penalty | C: Contested | 11/05/2019 | $8,051.00 | 12/03/2019 | Serious | |
Penalty | Z: Issued | 10/10/2019 | $8,051.00 | 12/03/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i): Process safety information pertaining to the equipment in the process did not include the elements specified in 29 CFR 1910.119(d)(3)(i)(A) through (H): Location: Reactor Room MA-24 Ventilation system information did not include information such as materials of construction, ventilation system design, or design flow rates for the gas cylinder cabinet or the scrubber.