Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1384474.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,789.00
Current Penalty: $2,841.75
Issuance Date: 06/14/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 5
Report ID: 0214200
Contest Date:
Final Order: 07/03/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/03/2019 | $2,841.75 | Serious | ||
| Penalty | Z: Issued | 06/14/2019 | $3,789.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii): The procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to the following specified in paragraphs (c)(4)(ii)(a)-(c)(4)(ii)(d): Location: 106 Passaic Ave Fairfield Ave Fairfield, NJ 07004 - Machine Shop a) The employer failed to develop and implement machine specific energy control procedures for employees conducting servicing and maintenance operations on equipment to include but not limited to the Fadal CNC88-VMC40 contouring milling machine. Condition noted on or about 3/12/19.