Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1378633.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,419.00
Current Penalty: $6,251.00
Issuance Date: 05/03/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 07/18/2019
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 05/28/2019
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | $6,251.00 | 07/18/2019 | Serious | ||
| Penalty | I: Informal Settlement | 05/28/2019 | $6,251.00 | 06/18/2019 | Serious | |
| Penalty | Z: Issued | 05/03/2019 | $10,419.00 | 05/21/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a.) On or about February 14, 2019, the employer did not ensure employees were protected while operating the Gutter Coiler #1. Employees were required to refeed the metal into the metal locking plate on top of the Rewind Reel and are exposed to a rotating mandrel.
Translate