Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1370297.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $3,789.00
Current Penalty: $2,740.00
Issuance Date: 06/04/2019
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0216000
Contest Date:
Final Order: 07/26/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/26/2019 | $2,740.00 | Serious | ||
Penalty | Z: Issued | 06/04/2019 | $3,789.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: location: entire site on or about: 12/5/18-12/11/18 a) Employees, engaged in steel erection, were using a JLG scissor lift to access upper work areas. The lift was not inspected for visible defects by a competent person before each work shift. NOTE: Because abatement of this violation is already documented in the inspection casefile, the employer need not submit certification or documentation of abatement for this violation as normally required by 29 CFR 1903.19.