Violation Detail
Standard Cited: 19100304 F01 IV Wiring design and protection.
Inspection Nr: 1369475.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,304.00
Current Penalty: $3,978.00
Issuance Date: 03/13/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0214200
Contest Date:
Final Order: 04/03/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/03/2019 | $3,978.00 | Serious | ||
Penalty | Z: Issued | 03/13/2019 | $5,304.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.304(f)(1)(iv): Overcurrent devices were not readily accessible to each employee or authorized building management personnel: Location: 3 Oak Rd Fairfield, NJ 07004- Distribution warehouse a) Employees exposed to fire & smoke inhalation hazards; employees did not have access to electrical disconnect switches while they were obstructed by metallic shelving units on or about 1/7/19.