Violation Detail
Standard Cited: 19260960 B03 I B
Inspection Nr: 1362392.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,282.00
Current Penalty: $5,000.00
Issuance Date: 04/04/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/10/2019
Gravity:
Report ID: 0627500
Contest Date:
Final Order: 04/23/2019
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/23/2019 | $5,000.00 | 04/10/2019 | Other | |
| Penalty | Z: Issued | 04/04/2019 | $9,282.00 | 04/10/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.960(b)(3)(i)(B): Two employees were not present during installation, removal, or repair of deenergized lines if an employee is exposed to contact with other parts energized at more than 600 volts: On or about November 27, 2018, an employee was exposed to an electrical shock hazard for entering the restricted approach boundary during the removal of de-energized wires.