Violation Detail
Standard Cited: 19100147 C06 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1354428.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,467.00
Current Penalty: $3,233.50
Issuance Date: 11/09/2018
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 12/31/2018
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 12/04/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/04/2018 | $3,233.50 | 12/31/2018 | Serious | |
| Penalty | Z: Issued | 11/09/2018 | $6,467.00 | 12/31/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i)(B): The periodic inspection of the energy control procedure was not conducted to correct any deviations or inadequacies identified. On 10/10/18, at the Comer facility, the employer did not conduct an at least annual inspection of the lockout procedures to correct for inadequacies in the procedures. Procedures reviewed did not have magnitudes of energies listed and procedures were not created for some equipment.