Violation Detail
Standard Cited: 19100147 C07 III C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1352133.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $26,520.00
Issuance Date: 04/05/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/01/2019
Gravity:
Report ID: 0316100
Contest Date: 04/29/2019
Final Order: 02/27/2020
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 02/27/2020 | $26,520.00 | 05/01/2019 | Other | |
| Penalty | C: Contested | 04/29/2019 | $13,260.00 | 05/01/2019 | Serious | |
| Penalty | Z: Issued | 04/05/2019 | $13,260.00 | 05/01/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(7)(iii)(C): Retraining of employees for proficiency did not the introduce new or revised control methods and procedures as necessary:(a) (LOCATION) (IDENTIFY SPECIFIC OPERATIONS AND/OR CONDITIONS) (IDENTIFY MACHINERY OR EQUIPMENT) Project MD 355 Staging Area - On or about October 5, 2018, in the process of dismantling an air compressor receiver tank and removing the air compressor receiver tank from the worksite, the employee did not confirm that all of the air had been released and drained from the air compressor receiver tank's pipes prior to loosening a pipe that was still pressurized.