Violation Detail
Standard Cited: 19260651 B04 Specific Excavation Requirements.
This violation item has been deleted.
Inspection Nr: 1347967.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,282.00
Current Penalty: $0.00
Issuance Date: 03/18/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/28/2019
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order: 04/26/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/26/2019 | $0.00 | 03/28/2019 | Serious | |
| Penalty | Z: Issued | 03/18/2019 | $9,282.00 | 03/28/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.651(b)(4): While the excavation was opened, underground installations were not protected, supported or removed as necessary to safeguard employees. a) Jobsite: 12" gas line inside trench - The employer did not protect the gas line as necessary to safeguard employees installing a 12" water main pipe inside the trench measuring approximately 21' in length, 4' 8" in width, and 8 ft. in depth. An employee inside the trench was using a shovel, and a 15k lb. backhoe was used to excavate soil in proximity to the gas line. Observed on or about 9/21/18.
Translate