Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1346596.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,210.00
Current Penalty: $8,680.00
Issuance Date: 02/12/2019
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 02/27/2019
Gravity: 10
Report ID: 0523900
Contest Date:
Final Order: 03/05/2019
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/05/2019 | $8,680.00 | 02/27/2019 | Serious | |
| Penalty | Z: Issued | 02/12/2019 | $10,210.00 | 02/27/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: (a) Sawmill, edger line; On or about September 5, 2018, the energy isolation (lockout) procedures did not identify how to shutdown, isolate, block, and secure pneumatic and gravity energy sources for the edger pressure rollers.