Violation Detail
Standard Cited: 19260960 C01 III B
Inspection Nr: 1339797.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,282.00
Current Penalty: $4,500.00
Issuance Date: 01/24/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/30/2019
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 02/20/2019
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/20/2019 | $4,500.00 | 01/30/2019 | Serious | |
| Penalty | Z: Issued | 01/24/2019 | $9,282.00 | 01/30/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.960(c)(1)(iii)(B): The energized part was not insulated from the employee and from any other conductive object at a different potential: On or about August 16, 2018, worksite located at 8538 Arabian Lane, Burneyville, OK 73430, the employer did not ensure that energized parts or conductive objects were insulated from the employee working on the power distribution line. Employees were exposed to the hazard of electrical shock and electrocution.
Translate