Violation Detail
Standard Cited: 19100027 B01 II Scaffolds and rope descent systems.
Inspection Nr: 1338252.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,239.00
Current Penalty: $6,929.25
Issuance Date: 11/14/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/01/2019
Gravity: 5
Report ID: 0111500
Contest Date:
Final Order: 12/03/2018
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/03/2018 | $6,929.25 | 02/01/2019 | Serious | |
Penalty | Z: Issued | 11/14/2018 | $9,239.00 | 11/27/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.27(b)(1)(ii): The employer did not ensure that no employee(s) uses any anchorage before the employer has obtained written information from the building owner that each anchorage meets the requirements of paragraph (b)(1)(i) of this section and that the employer must keep the information for the duration of the job. Jobsite: The employer did not obtain written information from the building owner that each anchorage had met the appropriate requirements prior to allowing employees to use a rope descent system.