Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1334430.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,772.00
Current Penalty: $1,579.00
Issuance Date: 11/27/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 12/31/2018
Gravity: 5
Report ID: 0830500
Contest Date:
Final Order: 12/13/2018
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/13/2018 | $1,579.00 | 12/31/2018 | Serious | |
| Penalty | Z: Issued | 11/27/2018 | $2,772.00 | 12/31/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(3): Employer did not advise employees of the location of energized electrical power circuits, the hazards involved, and the protective measures to be taken: (a) ISA Construction, LLC. at 4337 Tennyson St., Denver, CO 80212: On and before June 9, 2018, the employer did not ensure employees working on the third floor were advised of the location of energized overhead power lines, the hazards involved, and the protective measures to be taken before work begun. Employees were utilizing a bull float with an approximately 18 foot long metal handle to finish the poured concrete on the third floor deck while there were energized overhead power lines approximately 15-20 feet away from the back of the building. This condition exposed employees to the hazards of electric shock, electrical burns, and electrocution.
Translate