Violation Detail
Standard Cited: 19150034 C01 IV Mechanical paint removers.
Inspection Nr: 1334404.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,481.00
Current Penalty: $6,000.00
Issuance Date: 09/06/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/02/2018
Gravity: 5
Report ID: 0316300
Contest Date:
Final Order: 10/01/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/01/2018 | $6,000.00 | 10/02/2018 | Serious | |
| Penalty | Z: Issued | 09/06/2018 | $8,481.00 | 10/02/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1915.34(c)(1)(iv): Dead man control devices were not provided at the nozzle end of the blasting hose: a) Colonna's Shipyard: On or about 07/21/2018, employees engaged in slurry blasting the hull of barge VCM 217 did not have the dead man switch clamped per the manufacturer's pre-operational procedure listed in section 6.1.7, as a result an employee was struck by the nozzle. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.