Violation Detail
Standard Cited: 19100252 A03 II General requirements.
Inspection Nr: 1332636.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,696.00
Current Penalty: $2,217.60
Issuance Date: 12/26/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 01/23/2019
Gravity: 5
Report ID: 0420600
Contest Date:
Final Order: 01/22/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/22/2019 | $2,217.60 | 01/23/2019 | Serious | |
| Penalty | Z: Issued | 12/26/2018 | $3,696.00 | 01/23/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.252(a)(3)(ii): All hollow spaces, cavities, or containers were not vented to permit the escape of air or gases before preheating, cutting, or welding was performed: (a) On of about July 18, 2018, at the fabrication shop, welding was conducted on a fuel tank that had not been purged, exposing employees to an explosion hazard.