Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1330891.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $8,481.00
Current Penalty: $8,481.00
Issuance Date: 09/11/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 10/04/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/04/2018 | $8,481.00 | Serious | ||
| Penalty | Z: Issued | 09/11/2018 | $8,481.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about 07/09/2018 - Par-Fry Line 1, Barrel Breader/Pre-Duster, lockout was not utilized when cleaning the auger.
Translate