Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1328840.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $129,336.00
Current Penalty: $23,000.00
Issuance Date: 12/26/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0317500
Contest Date: 01/23/2019
Final Order: 10/28/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 10/28/2019 | $23,000.00 | Serious | ||
Penalty | C: Contested | 01/24/2019 | $129,336.00 | Willful | ||
Penalty | Z: Issued | 12/26/2018 | $129,336.00 | Willful |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: (a) Facility, Store/Gasoline Station: On or before July 5, 2018, the employer bolted and plated a rear exit door closed at the facility. An employee was overcome by heavy smoke, carbon monoxide, and heat when they were unable to escape through the rear exit door after a fire occurred.