Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1319241.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,959.00
Current Penalty: $7,100.00
Issuance Date: 08/22/2018
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 10/24/2018
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 09/14/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/14/2018 | $7,100.00 | 10/24/2018 | Serious | |
| Penalty | Z: Issued | 08/22/2018 | $9,959.00 | 10/10/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed. On 5/23/18, at the Flowery Branch facility, the employer did not conduct a periodic inspection of the Lockout program to ensure deficiencies are corrected and verify all equipment had specific written procedures (Single Block B1603 was added to production 1 year 9 months earlier and Single Block D1602 was added 1 year ago).
Translate