Standard Cited: 19260451 B01 General requirements.
This violation item has been deleted.
Inspection Nr: 1310208.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,068.00
Current Penalty: $0.00
Issuance Date: 09/05/2018
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 10/01/2018
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 10/01/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/01/2018 | $0.00 | 10/01/2018 | Serious | |
| Penalty | Z: Issued | 09/05/2018 | $7,068.00 | 10/01/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) 1) 13th Street Bridge and Front Avenue: On or about April 11, 2018, the employer exposed employees to fall hazards, while working approximately 54 1/2 feet high on a scaffold system where the platforms were not fully planked on all levels. 2) 13th Street Bridge: On or about April 11, 2018, the employer exposed employees to fall hazards, while working approximately 9 buck high on a scaffold system where the platforms were not fully planked on all levels.