Violation Detail
Standard Cited: 19100107 B01 Spray finishing using flammable and combustible materials.
Inspection Nr: 1308345.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,760.00
Current Penalty: $5,094.00
Issuance Date: 09/21/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/25/2019
Gravity: 5
Report ID: 0316700
Contest Date: 10/12/2018
Final Order: 01/09/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/09/2019 | $5,094.00 | 03/25/2019 | Serious | |
| Penalty | C: Contested | 10/15/2018 | $7,760.00 | 03/25/2019 | Serious | |
| Penalty | Z: Issued | 09/21/2018 | $7,760.00 | 03/25/2019 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.107(b)(1): The spray booth was not substantially constructed of steel, securely and rigidly supported, or of concrete or masonry: (a) Powder Coating Operation - The two spray booths used for the powder coating operation were not constructed of steel or concrete, on or about April 11, 2018. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate