Violation Detail
Standard Cited: 19100269 B01 II Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1305883.015
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $12,934.00
Current Penalty: $0.00
Issuance Date: 07/31/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/17/2018
Gravity: 10
Report ID: 0420100
Contest Date: 08/24/2018
Final Order: 11/04/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/04/2019 | $0.00 | 08/17/2018 | Serious | |
Penalty | C: Contested | 08/28/2018 | $12,934.00 | 08/17/2018 | Serious | |
Penalty | Z: Issued | 07/31/2018 | $12,934.00 | 08/17/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(b)(1)(ii): For fixed work locations the number of trained persons available was not sufficient to ensure that each employee exposed to electric shock could be reached within four (4) minutes by a trained person: (a) On or about 3/16/2018 - Cooling Tower Lift Pump Station 6.9 KV Cooling Tower Board B Compartment 2, trained persons were not available within four (4) minutes of employees exposed to electric shock.