Violation Detail
Standard Cited: 19100107 B01 Spray finishing using flammable and combustible materials.
Inspection Nr: 1304632.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,174.00
Current Penalty: $3,621.80
Issuance Date: 06/11/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/13/2018
Gravity: 5
Report ID: 0316400
Contest Date: 07/18/2018
Final Order: 02/02/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 01/23/2020 | $5,174.00 | 07/13/2018 | Serious | |
| Penalty | F: Formal Settlement | 02/02/2019 | $3,621.80 | 07/13/2018 | Serious | |
| Penalty | Z: Issued | 06/11/2018 | $5,174.00 | 07/13/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.107(b)(1): Spray booths were not substantially constructed of steel, securely and rigidly supported, or of concrete or masonry except that aluminum or other substantial noncombustible material may be used for intermittent or low volume spraying: (a) Paint Area: On April 3, 2018 and times prior, employees conducted a flammable spray coating operation on manufactured steel components inside a ventilated spray booth. The spray booth was not fully constructed with noncombustible materials. One end of the spray booth was constructed of combustible polyethylene curtains and the sides of the spray booth were covered in cardboard.