Violation Detail
Standard Cited: 19260451 F04 General requirements.
Inspection Nr: 1302601.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $3,880.00
Current Penalty: $3,880.00
Issuance Date: 06/12/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 06/26/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | A: Amendment | 10/10/2018 | $3,880.00 | Serious | ||
Penalty | I: Informal Settlement | 06/26/2018 | $1,940.00 | Serious | ||
Penalty | Z: Issued | 06/12/2018 | $3,880.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(4): Part(s) of a scaffold that were damaged or weakened, such that the scaffold's strength was less than that required by paragraph (a) of this section, were not immediately repaired, replaced, braced to meet those provisions, nor removed from service until repaired. Location - 5 Courthouse Ln. Chelmsford On or about 19 Mar, 2018, the employer failed to ensure the an employee working on an elevated platform was protected from falls due to a damaged and weakened plank unable to support four times the intended loads.