Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1302252.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,641.00
Current Penalty: $6,984.00
Issuance Date: 04/11/2018
Nr Instances: 45
Nr Exposed: 4
Abatement Date: 05/16/2019
Gravity: 10
Report ID: 0215800
Contest Date:
Final Order: 06/05/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/05/2018 | $6,984.00 | 05/16/2019 | Serious | |
| Penalty | Z: Issued | 04/11/2018 | $11,641.00 | 05/16/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Production Floor, on or about 3/13/18: Neither lockout procedures in accordance with 29 CFR 1910.147(c)(4)(i) nor other effective alternative measures pursuant to 29 CFR 1910.147(a)(2)(ii) were utilized when performing chip clearing and oil nozzle adjustments on including, but not limited to Wickman screw machine, Model 1 3/4-6, Serial #15714, Machine #LW02, along with 44 other Wickman screw machines. Abatement documentation must be submitted for this item.
Translate