Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1301606.015
Citation: 01001
Citation Type: Serious
Abatement Date: 07/09/2018 2
Initial Penalty: $3,880.00
Current Penalty: $2,328.00
Issuance Date: 06/19/2018
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 08/06/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/06/2018 | $2,328.00 | 07/09/2018 | Serious | |
Penalty | Z: Issued | 06/19/2018 | $3,880.00 | 07/09/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolding was not fully planked or decked: a) At the job site, on or about March 8, 2018, the working level of tubular welded frame scaffolding was not fully planked, exposing employees to fall hazards.