Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1301275.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,853.00
Current Penalty: $5,497.10
Issuance Date: 03/29/2018
Nr Instances: 3
Nr Exposed: 9
Abatement Date: 04/09/2018
Gravity: 5
Report ID: 0317700
Contest Date:
Final Order: 04/23/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/23/2018 | $5,497.10 | 04/09/2018 | Serious | |
| Penalty | Z: Issued | 03/29/2018 | $7,853.00 | 04/09/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: a) East Building: Ilapak Vegatronic 500 (S/N #0680700045): The opening on the guard for the heat sealer (pressure bar) and the sealant element had an opening of approximately 15.5 inches in width and 8.5 inches in length, allowing for employees to potentially reach into the danger zone during the operation cycle, exposing employees to a potential caught-in/between hazard, observed on or about March 15, 2018. b) Specialty Area: Two Jasa packaging machines (unknown Model): The opening on the guard for the heat sealer (pressure bar) and the sealant element had an opening of approximately 18 3/4 inches in length and about 31 inches in width, allowing for employees to potentially reach into the danger zone during the operation cycle, exposing employees to caught-in/between hazard, observed on or about March 15, 2018. Abatement Certification Required