Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1298467.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,114.00
Current Penalty: $7,960.00
Issuance Date: 08/13/2018
Nr Instances: 4
Nr Exposed: 10
Abatement Date: 12/31/2018
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 08/28/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | P: Petition to Mod Abatement | $7,960.00 | 12/31/2018 | Serious | ||
| Penalty | I: Informal Settlement | 08/28/2018 | $7,960.00 | 09/07/2018 | Serious | |
| Penalty | Z: Issued | 08/13/2018 | $7,114.00 | 09/07/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. (a) The periodic inspection of the energy control program was inadequate, in that it did not include a review of each machine specific procedure for each type of equipment, to include the slitters, coaters, compressors and rewinders.