Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1298046.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,054.00
Current Penalty: $5,885.10
Issuance Date: 05/30/2018
Nr Instances: 5
Nr Exposed: 10
Abatement Date: 06/25/2018
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 06/20/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/20/2018 | $5,885.10 | 06/25/2018 | Serious | |
Penalty | Z: Issued | 05/30/2018 | $9,054.00 | 06/25/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: On or about 2/28/2018, at the production areas at 150 Dundee Drive, Milledgeville, GA: The employer failed develop and utilize specific LOTO specific written procedure for maintenance, service, troubleshooting, repairs, clearing, and unjamming the waste sorting equipment, conveyors, elevators, baler, and powered industrial trucks.