Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1294298.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $5,174.00
Current Penalty: $5,174.00
Issuance Date: 02/28/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/26/2018
Gravity:
Report ID: 0626600
Contest Date:
Final Order: 03/15/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/15/2018 | $5,174.00 | 04/26/2018 | Other | |
| Penalty | Z: Issued | 02/28/2018 | $5,174.00 | 03/19/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: On or about February 10, 2018, on the sixth floor of a commercial building where employees were exposed to an electrical shock hazard when installing 277 VAC ceiling lights without the electric power circuits being de-energized.