Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1287806.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,880.00
Current Penalty: $3,200.00
Issuance Date: 04/05/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/01/2018
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 05/01/2018
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/01/2018 | $3,200.00 | 05/01/2018 | Serious | |
| Penalty | Z: Issued | 04/05/2018 | $3,880.00 | 05/01/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6): (a) On or about January 10, 2018, at the front of a two-story commercial building, a tubular welded frame scaffold was erected such that it and conductive objects handled on it came closer than 10 feet to an energized, uninsulated overhead power line, 13.2 kV phase to phase, exposing employees to an electrical hazard.