Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1287395.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/16/2018 2
Initial Penalty: $12,934.00
Current Penalty: $10,000.00
Issuance Date: 02/08/2018
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): R
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 02/22/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/22/2018 | $10,000.00 | 04/16/2018 | Serious | |
Penalty | Z: Issued | 02/08/2018 | $12,934.00 | 03/07/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: (a) WALLBUIDLING DEPARTMENT - Employee(s) operated the Deken Power Gangbuster Jr press, and the employer had not provided guarding to protect employee(s) from the pinch point created by the back stroke of the press, between the press and the stand that the machine is attached to, which thereby exposed the employee(s) to amputation injuries, on or about January 8, 2018. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.