Violation Detail
Standard Cited: 19260961 B04 II
Inspection Nr: 1277006.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 02/22/2018
Nr Instances: 1
Nr Exposed: 200
Abatement Date: 09/14/2022
Gravity: 10
Report ID: 0522500
Contest Date: 03/22/2018
Final Order: 08/15/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 08/15/2022 | $12,934.00 | 09/14/2022 | Serious | |
| Penalty | C: Contested | 03/29/2018 | $12,934.00 | 03/14/2018 | Serious | |
| Penalty | Z: Issued | 02/22/2018 | $12,934.00 | 03/14/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.961(b)(4)(ii): Each crew shall independently comply with this section and, if there is no system operator in charge of the lines or equipment, shall have separate tags and coordinate deenergizing and reenergizing the lines and equipment with the other crews. a. On or before November 6, 2017 where employees were preparing an electrical cable for the installation of a pothead, the riser crew and the underground residential distribution crew did not independently ground and tag the cables when deenergizing and reenergizing the system, resulting in the hospitalization of an employee due to the resulting shock.