Violation Detail
Standard Cited: 19100036 A02 Design and construction requirements for exit routes.
Inspection Nr: 1274399.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,467.00
Current Penalty: $6,467.00
Issuance Date: 04/13/2018
Nr Instances: 1
Nr Exposed: 50
Abatement Date: 05/09/2018
Gravity: 5
Report ID: 0214500
Contest Date: 05/01/2018
Final Order: 02/04/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/04/2019 | $6,467.00 | 05/09/2018 | Serious | |
Penalty | C: Contested | 05/01/2018 | $6,467.00 | 05/09/2018 | Serious | |
Penalty | Z: Issued | 04/13/2018 | $6,467.00 | 05/09/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(a)(2): An exit must be separated by fire resistant materials. Construction materials used to separate an exit from other parts of the workplace must have a one-hour fire resistance-rating if the exit connects three or fewer stories and a two-hour fire resistance-rating if the exit connects four or more stories. a) Main exit: A wooden door that separated an exit from the workplace did not have a fire resistance-rating, on or about 10/13/2017.