Standard Cited: 19260552 C17 IV A Material hoists, personnel hoists, and elevators.
This violation item has been deleted.
Inspection Nr: 1273407.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,622.00
Current Penalty: $0.00
Issuance Date: 12/15/2017
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 01/09/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection | 
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/09/2018 | $0.00 | Serious | ||
| Penalty | Z: Issued | 12/15/2017 | $3,622.00 | Serious | 
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.552(c)(17)(iv)(a): Wire rope shall be taken out of service when any of the following conditions exist: In running ropes, six randomly distributed broken wires in one lay or three broken wires in one strand in one lay: On or about October 20, 2017, during the construction of an underground sewer relief tunnel the employer did not remove from service a wire running rope missing an entire rope strand. The wire rope was wound on the drum of a hydraulic powered pull master winch and used to hoist material.