Violation Detail
Standard Cited: 19260025 A Housekeeping.
Inspection Nr: 1271630.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $3,658.00
Current Penalty: $3,658.00
Issuance Date: 04/17/2018
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 04/27/2018
Gravity: 5
Report ID: 0317000
Contest Date:
Final Order: 05/15/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 04/17/2018 | $3,658.00 | 04/27/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, form and scrap lumber with protruding nails, and all other debris, shall be kept cleared from work areas, passageways, and stairs, in and around buildings or other structures. a) Jobsite: The employer did not ensure that scrap lumber, protruding nails and other debris was kept clear in passageways throughout the jobsite; thus exposing the employees to impalement, trip and fall hazards. Condition was observed on or about 19 OCT 2017.