Violation Detail
Standard Cited: 19260451 E01 General requirements.
Inspection Nr: 1269287.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $5,174.00
Current Penalty: $5,174.00
Issuance Date: 04/03/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/09/2018
Gravity: 10
Report ID: 0213900
Contest Date:
Final Order: 04/26/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 04/03/2018 | $5,174.00 | 04/09/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used: a) Exterior, Southeast corner of construction area: Employee climbed from the platform up approximately 3 feet onto the roof, using the mid and top rails of the SkyJack Model SJIII 3219 Scissor Lift, id #908316RA, elevated approximately 20 feet above ground when climbing onto the roof; on or about 10/10/2017. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.