Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1259451.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,338.00
Current Penalty: $6,338.00
Issuance Date: 11/13/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/01/2017
Gravity: 5
Report ID: 0830600
Contest Date:
Final Order: 12/05/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/05/2017 | $6,338.00 | 12/01/2017 | Serious | |
| Penalty | Z: Issued | 11/13/2017 | $6,338.00 | 12/01/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: a) On or about August 29, 2017, and at times prior, employees were exposed to amputation and/or struck by hazards where the Lockout/Tagout program did not have specific procedures outlining steps to shut down, isolate, block and secure the Steston Ross planer. Abatement Note: Abatement certification is required for this item (see enclosed "Certification of Corrective Action Worksheet").