Violation Detail
Standard Cited: 19260966 G02
Inspection Nr: 1258259.015
Citation: 01001
Citation Type: Other
Abatement Date: 01/24/2018 2
Initial Penalty: $12,934.00
Current Penalty: $6,467.00
Issuance Date: 01/09/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity:
Report ID: 0523300
Contest Date: 02/02/2018
Final Order: 08/16/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/16/2018 | $6,467.00 | 01/24/2018 | Other | |
Penalty | C: Contested | 02/06/2018 | $12,934.00 | 01/24/2018 | Serious | |
Penalty | Z: Issued | 01/09/2018 | $12,934.00 | 01/24/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.966(g)(2): Job briefing. The job briefing required by � 1926.952 shall cover information on special system conditions affecting employee safety, including the location of energized equipment in or adjacent to the work area and the limits of any deenergized work area. On or about August 24, 2017, the pre-job briefing was not specific to the hazards associated with ground removal within the substation, such as temporary grounds were not being used.