Violation Detail
Standard Cited: 19180051 B General requirements (See also 1918.11 and Appendix III of this part).
Inspection Nr: 1256654.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 01/19/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/31/2018
Gravity:
Report ID: 0625700
Contest Date:
Final Order: 03/05/2018
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/05/2018 | $12,934.00 | 01/31/2018 | Other | |
| Penalty | Z: Issued | 01/19/2018 | $12,934.00 | 01/31/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1918.51(b): All components of cargo handling gear, including tent gantlines and associated rigging, were not inspected by the employer or a designated person before each use and at appropriate intervals during use. a) 3411 Jourdan Rd., New Orleans, LA; On or about August 19, 2017, the employer failed to ensure a four way bridle was inspected before use. The hooks on the four way bridle were missing the latches.
Translate